You are here:   Portfolio > Institutional > HRWC
Subtrade Login  |   Employee login
back | next

Delivery Method:
Design, Build, Contractor

Owner:
Halifax Regional Water Commission (HRWC)

Consultant:
Fowler Bauld & Mitchell

Value:
$5.5 M

Completion Date:
August 2005

   
Halifax Regional Water Commission, Halifax, NS
 
A mixed use facility for the Halifax Regional Water Commission to replace their existing facilities by combining several operations in the same location.  A two storey administration section with a storage /vehicle repair facility.   In addition to the main building, a separate Pre-Engineered Building was constructed to house materials needed for the daily operation of maintaining the water needs of the HRM. Tilt-up concrete exterior panels.

 

Quality - Integrity - Commitment
 
 

11 Morris Drive, Suite 212,
Dartmouth, NS      B3B 1M2
Tel: (902) 468-7471 | Fax: (902) 468-7715
maxim2000@maximconstruction.ca

 
 

555 Somerset St., Suite 208,
Saint John, NB      E2K 4X2
Tel: (506) 652-9292 | Fax: (506) 636-9678

maxim2000@maximconstruction.ca

 

Copyright 2009 by Maxim Construction    |   Login
);