back | next

Delivery Method:
Construction Management

Owner:
Springfield Hotels

Consultant:
Chamberlain Architects


Completion Date:
2008

   
Holiday Inn Express, Enfield, NS
 
Six level concrete structure, masonry exterior with 116 rooms/suites, breakfast/buffet facility, indoor pool, meeting rooms and back up generator system.  Completed in a ten month time frame.  

 

Quality - Integrity - Commitment
 
 

11 Morris Drive, Suite 212,
Dartmouth, NS      B3B 1M2
Tel: (902) 468-7471 | Fax: (902) 468-7715
maxim2000@maximconstruction.ca

 
 

555 Somerset St., Suite 208,
Saint John, NB      E2K 4X2
Tel: (506) 652-9292 | Fax: (506) 636-9678

maxim2000@maximconstruction.ca

 

Copyright 2009 by Maxim Construction    |   Login
);